Find the smallest and largest fuse allowed on a transformer's primary and secondary under NEC 450.3(B), or NEC 430.72(C) for control circuit transformers, and see matching Class CC and midget fuse part numbers.

Transformer

Common control transformers

Code rule and protection

How the limits work
  • Primary only (Table 450.3(B)): 125% of primary current at 9 A or more, 167% from 2 A to under 9 A, and 300% under 2 A.
  • Primary and secondary: primary up to 250%; secondary 125% at 9 A or more, 167% under 9 A.
  • Rounding up (Table 450.3(B) Note 1): only the 125% limits may go up to the next standard rating in NEC 240.6(A). The 167%, 250%, 300% and 500% limits are hard maximums.
  • NEC 430.72(C) covers control circuit transformers in motor control circuits. (C)(4) allows primary protection up to 500% when the primary current is under 2 A. Otherwise, protect the transformer per Article 450 as (C)(2) permits.
  • Minimum: the smallest fuse that carries the transformer's full-load current. Primary fuses also have to ride through magnetizing inrush, so use time-delay fuses and check the fuse maker's guidance if a size near the minimum blows on energizing.

Primary fuse

—

Secondary fuse

—

Fuse part numbers

How the fuse limits are worked out

  1. Full-load current on each side: VA ÷ volts for a single-phase transformer, or VA ÷ (√3 × volts) for three-phase.
  2. Maximum fuse from NEC Table 450.3(B) for transformers 1000 V and under:
    • Primary only: 125% at 9 A or more, 167% from 2 A to under 9 A, 300% under 2 A.
    • Primary and secondary: primary up to 250%; secondary 125% at 9 A or more, 167% under 9 A.
    • Only the 125% values may round up to the next standard rating in NEC 240.6(A) (Table 450.3(B), Note 1). All other percentages are hard limits, so you round down to an available fuse.
  3. Control circuit transformers (NEC 430.72(C)): when the primary current is under 2 A, (C)(4) allows primary protection up to 500%. Otherwise, protect the transformer per Article 450 as (C)(2) permits.
  4. Minimum fuse: the smallest rating that carries the transformer's full-load current. Anything smaller can open under normal load.

Worked example

The calculator opens with a 500 VA, 480 V to 120 V single-phase control transformer with primary fuses only.

Choosing the fuse type

Some manufacturers' fuse charts round the 167% and 300% limits up to the next fuse size. The NEC allows rounding up only on the 125% limits, so this calculator may give a size one step smaller than those charts.

This calculator covers transformer protection only. Conductor protection (NEC 240.4 and 725 / 724) and short-circuit ratings are separate checks.

Frequently asked questions

What size fuse do I need for a control transformer primary?

Divide the VA by the primary voltage to get the primary current. With primary fuses only, NEC Table 450.3(B) allows up to 300% under 2 A, 167% from 2 A to under 9 A, and 125% at 9 A or more. A 500 VA, 480 V transformer draws 1.04 A, so the primary fuse can be up to 3 A.

When can I use 500% on a control transformer primary?

NEC 430.72(C)(4) allows primary protection up to 500% when the transformer is a control circuit transformer in a motor control circuit and its rated primary current is under 2 A.

Can I round up to the next fuse size?

Only for the 125% limits in Table 450.3(B) (Note 1), which may go up to the next standard rating in NEC 240.6(A). The 167%, 250%, 300% and 500% limits are maximums, so round down to an available fuse.

What fuse should I use on a control transformer?

Use time-delay fuses that ride through the transformer's magnetizing inrush, such as Class CC Mersen ATQR, Bussmann FNQ-R or Littelfuse KLDR on the primary. Midget time-delay fuses such as the Mersen ATQ are common on the secondary where supplementary protection is acceptable.